![]() |
NINGBO WITMIN IMPORT&EXPORT CO.,LTD.
|
Payment Terms: | T/T,L/C,D/A,D/P,WU |
Place of Origin: | Zhejiang, China (Mainland) |
![]() |
![]() |
Add to My Favorites | |
HiSupplier Escrow |
Packaging Detail: | Packing:In strong fumigate wooden pallet packing |
Delivery Detail: | 15 to 30days after place an order |
Sprocket Komatsu undercarriage Excavator Part
1.GB and ISO9001:2012
2.250000units every year
3.Hardness assurance by forging
Sprocket Komatsu undercarriage Excavator Part
The power from the excavator engine deliver to the track link by travel motor and sprocket,and the sprocket must engage with the track link to get steady in transferring.
When the track link elongation caused by the track pin bush damaged,they also can get mesh.
The sprocket usually install in the rear of the excavator's driving device.
Model | PC120-5-6 |
Color | Yellow or Black |
Material | 50mn |
Surface hardness | HRC55-62(depth 7-10mm) |
Production process | Casting |
Warranty time | 12month |